Board AI · Who it's for · Contractors
For contractorsBoard AI for contractors.
A remodel is dozens of small steps across trades: demo, rough-in, inspection, finish. Say the plan for each job and every step gets a card with an owner and a date.
For contractors
What Board AI does for contractors
Plan a whole job
One line makes the cards for every stage of the remodel.
Subs reply on WhatsApp
STARTED and DONE from the field move the card.
Inspections flagged
A failed or late inspection is a HELP that moves the card to Stuck.
Who's on what
See every crew's cards before you promise a start date.
Sound familiar?
Where contractors lose track
- "Which jobs are waiting on inspection?" It lives in your head and your truck.
- "The tile was never ordered." One step slipped and the whole job moved.
- "Is the sub there today?" You drive by to check.
- "Our board is a whiteboard." It's true on Monday and wrong by Wednesday.
Example
A week at Riverside Builders
Example · Riverside Builders is a made-up business
You: Plan Oak St kitchen remodel by Fri: order cabinets for Priya, electrical rough-in for Luis, book inspection for Maya Board AI: Oak St kitchen remodel: 3 cards in To do. KB7301 order cabinets (Priya) KB7302 electrical rough-in (Luis) KB7303 book inspection (Maya) WhatsApp to Priya: Hi Priya, reminder from Riverside Builders: order cabinets, Fri, Dec 4, 9 am. Reply STARTED when you begin, DONE when it's done, or LATER. Priya: STARTED Board AI to Priya: Thanks Priya, it's in Doing. Reply DONE when it's done, or HELP if you get stuck. Luis: HELP need the panel spec from the owner WhatsApp to you: ⚠️ Board AI: Luis needs you on "electrical rough-in": "HELP need the panel spec from the owner"
Worth knowing
Worth knowing for contractors
Permits, codes and inspections are your responsibility; I remind people about what you put on the board. A safety problem on site is a phone call, not a card.
Board AI for your contractor team, free.
Start free with 100 Works. No card needed.