Manager AI · Reports · Electricians
Sample reportA week at Hightower Electric. In one message.
Here is what a week of Manager AI looks like at a small electrical contractor. Hightower Electric is made up; the answers and counts are the kind you'd see in the app.
The report
A week of waiting on others
Four electricians, three jobsites, and the inspectors and utilities in between.
20
check-ins sent
19
answered
5
answers waiting on an inspection or utility
Example · Hightower Electric
Manager AI: Manager AI this week: Answered: 19 of 20. Tyler: (Tuesday) Can't energize the Birch St service, utility hasn't set the meter. You: Utility finally came Thursday. Calling them earlier next time.
What it noticed
Three things, one action
The utility was the longest wait
Birch St waited three days on a meter set. Requesting it as soon as the service is ready saves days.
The GC on Ash Ln held up rough-in
Two answers said framing wasn't finished. Worth confirming with the GC before sending a crew.
Apprentices answered every day
The apprentices answered all five mornings, which makes a quiet day from them worth noticing.
More